Every project presents its own challenges, site conditions, and goals. Our portfolio highlights the commercial, industrial, and municipal work we've completed throughout North Alabama, showcasing the experience, craftsmanship, and attention to detail that define Grounds Control.

dig into our projects

RG 6300

LEARN MORE

current projects

LEARN MORE

LEARN MORE

Lendon II Subdivision

LEARN MORE

LEARN MORE

Old Monrovia

stadium commons

recent projects

LEARN MORE

Airport Rescue Fire Facility

701 Gallatin st.

view more on the blog

LEARN MORE

Big Spring Park 

LEARN MORE

Chase Bank

CONTACT US

Our scope of work included complete site work, storm drainage installation, rock excavation, concrete work, asphalt paving, and final striping. Successfully navigating the site conditions while maintaining progress has required close coordination, flexibility, and a strong field effort from our team. 

Big Spring Park has been a challenging and rewarding project due to its significant elevation changes, extensive rock conditions, and numerous existing underground obstacles that required careful coordination and problem-solving throughout construction.

Big spring park

Back to Top
see more on the blog

Our scope of work included demolition, complete site work, storm drainage, sanitary sewer and water installation, concrete work, asphalt paving, striping, and landscaping. The project required careful coordination across multiple phases to successfully transition the property from an existing paved site into a fully developed community park for the City of Huntsville.

The Legacy Park project involved the transformation of an existing parking lot into a new community park, beginning with full demolition and site preparation.

legacy park

see more on the blog
CONTACT US
Back to Top
CONTACT US

The Airport Rescue Fire Facility was a complex site development project due to its location within an active airport environment and the strict rules, procedures, and coordination requirements established by airport authorities.

Our scope of work included complete site work, storm drainage installation, concrete work, asphalt paving, and final striping. Successful completion of the project required detailed planning, close coordination, and the ability to perform efficiently within the demanding operational requirements of an active airport.

Grounds Control moved more than 50,000 cubic yards of material throughout the project while maintaining the construction schedule and navigating challenging weather conditions and other site-related obstacles.

Airport Rescue Fire Facility 

Back to Top
see more on the blog
CONTACT US

Our scope of work included complete site work, storm drainage, water and sanitary sewer installation, electrical conduit installation, asphalt paving, and pavement striping. Successfully completing the project required flexibility, close coordination, and continual management of changing site and weather conditions.


The Lendon II Subdivision was a highly complex site development project that required extensive reconditioning of the existing soils to create suitable building lots and roadway areas. Challenging soil conditions, weather impacts, and demanding scheduling requirements required careful planning and coordination throughout construction.

Lendon II Subdivision

Back to Top
see more on the blog
CONTACT US

Our scope of work included demolition, complete site work, storm drainage, domestic water, fire water, sanitary sewer, electrical conduit installation, concrete work, asphalt paving, pavement striping, and landscaping. Successfully completing the project required extensive coordination, flexibility, and careful management of the construction schedule from initial demolition through final site improvements.

The Old Monrovia project was a complete turnkey site development project that required coordination across nearly every phase of construction. The project presented significant challenges due to harsh weather conditions, coordination with multiple trades, and demanding scheduling requirements.

Old Monrovia 

Back to Top
see more on the blog
CONTACT US

Our scope of work included demolition, complete site work, storm drainage, domestic water, fire water, sanitary sewer, concrete work, asphalt paving, pavement striping, and landscaping. The project was extremely rewarding and resulted in a high-quality finished product that showcased the team’s ability to manage a comprehensive site package from start to finish.

The Stadium Commons project was another complete turnkey site development project, beginning with the demolition of existing buildings and continuing through final site improvements.

Stadium Commons

Back to Top
see more on the blog
CONTACT US

The 6300 Redstone Gateway project is currently underway and includes a complete site work package. Our scope of work encompasses storm drainage, water, sewer, asphalt paving, and pavement striping.

RG 6300

Back to Top
see more on the blog
CONTACT US

Our scope of work includes complete site work, storm drainage, water and sewer installation, concrete work, asphalt paving, and pavement striping. Successfully performing the work requires careful coordination, sequencing, and efficient use of the limited space throughout construction.

The Chase Bank project is currently underway and presents a unique challenge due to the extremely confined site conditions and limited working area.

Chase Bank

Back to Top
see more on the blog
CONTACT US

Our scope of work includes complete site work, storm drainage, water and sewer installation, concrete work, asphalt paving, and pavement striping. Successfully performing the work requires careful coordination, sequencing, and efficient use of the limited space throughout construction.
The Huntsville Hospital Parking Lot (701 Gallatin St) project is currently underway and presents a unique challenge due to the extremely confined site conditions and limited working area.

701 Gallatin St.